MAINTENANCE OBJECTIVES:

The objectives of maintenance are to ensure the desired plant availability at an optimum cost within the safety prescription. In other words, it may be mentioned that the objective of maintenance is to minimise the total cost of unavailability and resources.

Whenever the plant is not available either due to breakdowns or due to planned stoppages, the following costs are incurred.

  1. Loss of earnings due to stoppage of equipment
  2. Loss of in service materials.

 

In addition the following costs are incurred on resources:

  1. Labour of overhead expenses
  2. Materials in spares and consumables
  3. Cost of storage of spares and facilities.

Hence, maintenance functions are so, organised as to minimise the total cost of unavailability and resources.

MAINTENANCE FUNCTIONS:

The above mentioned objectives are attained by taking certain action illustrated below:

image127.gif

image130.gif

In these, the first four steps are taken with the sole purpose of reducing friction, wear and effects of environment on the individual parts of a machine. For example, lubrication reduces friction; cleaning prevents corrosion and abrasion due to dust; adjustment of level or alignments or by tightening the loose bolts and nuts eliminates undue stresses; and preventive coatings guard against rust and corrosion. These action increase the useful life of parts and therefore, constitute an intrinsic part of Preventive Maintenance.

The next two steps, inspection of parts and analysis of history, are meant to assess the condition of the part, the extent of wear, the action required to remedy the defect and the time when such action should be undertaken. These activities are undertaken essentially to be able to plan the remedial measures.

Inspection can be external for abnormal sound or temperature which does not require a stoppage of the machine. It could even be internal, requiring a machine to be stopped either purely for inspection or at the time of some other repair or during overhauling of the machine. Historical data on the other hand, is a chronological record of repairs and replacements carried out on a machine during its life in the company. Analysis of such a record helps to estimate the life span of various components and establish the frequency of inspections, repairs, and replacements.

Replacement and repair of components can be undertaken on the basis of inspection reports, analysis of history or complaints of operating personnel. Another important part of maintenance is the change in some characteristics of the components which gives frequent trouble, to avoid re-occurrence of that trouble with that frequency. Such an action is taken on the basis of history of the equipment and evaluation of costs involved. This step can be defined as "Maintenance Prevention". Cost of maintenance of the machine rises with the increase in its age. Moreover, passage of time also affects the operational efficiency of the machine. Requirements of quality and quantity of production go through a change making an old machine more or less obsolete in relationship to the new demands.

New and better machines emerge in the market. All these factors make it necessary to replace the existing machines at some stage in their lives by new machines. Maintenance is vitally linked with such action. Analysis to determine the economics in replacement of machines and their physical installation, therefore, becomes a responsibility of the maintenance personnel.

MAINTENANCE TYPES:

  1. BREAKDOWN MAINTENANCE:

  2. Characteristics of Break-down Maintenance System:

  3. ROUTINE MAINTENANCE

  4. A procedure followed regularly i.e.,., A cyclic operation recurring periodically.

    Advantages

    1. Simple to establish & follow

    2. Little or no clerical work

    3. High degree of prevention by intercepting developing faults.

    A more advanced stage of routine maintenance calls for 'service instructions on a pre-printed schedule and checklists'

    Examples:

    Disadvantages:

  5. PLANNED MAINTENANCE

  6. In this type of service, the emphasis is placed on the machines.

    What does the manufacturer prescribe?

    Is the unit utilised for two, or three shifts per day?

    Is it working under normal load?

    Are the conditions as good as those envisaged by the manufacturer?

    Do we allow for extra attention owing to corrosion-including conditions?

    Characteristics of Planned Maintenance

    Advantages of Planned Maintenance

     

  7. PREVENTIVE MAINTENANCE

System which strives to reduce the likelihood of failures.

To achieve prevention of break-downs Planned service is carried out with the explicit additional objective of detecting wear points and ensuring perfect functioning by replacing parts which could still be used were it not for the assurance that is required.

Occasional use of statistical analysis/methods for determining life expectancies of parts.

The system employs Measuring & Inspection Devices. This phase is Predictive maintenance.

Preventive Maintenance System is more expensive due to more of planning and replacement of parts before failing.

PM increases reliability

PM reduces total work-load

PM reduces total down time

PM reduces unplanned work

PM reduces total maintenance cost

Routine maintenance & Planned maintenance also include Preventive maintenance action.

Preventive maintenance could be grouped as under:

-Fixed-time Maintenance

-Condition-based Maintenance

-Opportunity Maintenance

Corrective Maintenance:

Services carried out to restore an item to an acceptable working condition. Services arising out of

- Break-downs

- Malfunctioning &

- Deteriorating conditions

Productive Maintenance

An effort to set up the function on a planned and measured production pattern. The output relates to the number of servicing tasks completed, e.g., lubrication, inspection, overhaul, etc. Originally used in USA.

Total Productive Maintenance (TPM)

Efforts with the total participation of employees. Used in Japan

ECONOMICS OF MAINTENANCE:

Concept of preventive Maintenance is presently accepted in most of the industries in order to achieve their planned production. Both production and maintenance have the same objective - to produce a quality product at maximum efficiency and minimum cost. Theoretically maintenance should aim at keeping the machines and other facilities in a condition that allows them to be used without any interruption and at their maximum profit making capacity. Such a situation can be assured in practice only if machines are replaced frequently or if a stand-by machine is maintained which can be put into operation as and when the original unit is stopped for checks, repairs and component replacements. But, no industrial unit can possibly afford to throw away its capital resources by replacing machines frequently, nor can a company block its money in equipment that will be only partially utilised by having stand-bys. An organisation has, under such circumstances, to accept a certain loss in productive capacity of its investments to enable maintenance, to examine the various equipment, repair if not in order, and put them back in a condition as required by the users.

Analysis of Maintenance Cost

Downtime of an equipment costs money to the company, which is made up of maintenance labour spent, materials and spares consumed, and supervision exercised. Loss of revenue due to downtime because of maintenance, however, provides a saving to the organisation through extension of the useful life of plant and facilities and through maintaining them at the optimum standards of operation. This saving consists of reduction in wastage and scrapping of materials, higher level of employee morale and their safety, minimisation of process time and postponement of the necessity of investment for capital replacement

Management of maintenance has, therefore, to concern itself with the balancing of costs against gains so as to evolve the most suitable policies and determine the maintenance effort required, which as said earlier, is a function of cost and it can vary from Industry to Industry. In establishing a systematic maintenance system, the following stages are normally gone through.

0 stage - Only break-down maintenance

1st stage - Breakdown maintenance + certain amount of cleaning and lubrication

2nd stage - Breakdown maintenance + planned lubrica-tion and inspection

3rd stage - In addition to degree 2, preventive replacement of spares (renewal) is carried out

4th stage - In addition to degree 3, there are periodic maintenance schedules including overhauls

5th stage - In addition to degree 4, predictive maintenance techniques are adopted.

From above it is assumed that as the degree of maintenance effort increases the number of breakdown decreases, while on the other hand maintenance cost increases. Hence, there must be some compromise in order to achieve the optimum maintenance effort.

With the increase in maintenance effort the variation of breakdown cost, Preventive maintenance cost, cost of sub standard performance, cost of spares and the total cost can be graphically represented as shown in Fig.1.

Cost Elements:

The cost elements involved in the above mentioned costs are

image132.gif

The optimum maintenance effort required varies from Industry to Industry. Hence, the maintenance whose objective as said earlier, is to produce a quality product at maximum efficiency and minimum cost, should concern itself to evolve the most suitable maintenance effort required.